Over the past decade IEC 61850 has gained in popularity in various utilities across the globe for its promise of interoperability, scalability, maintainability and wire reduction. However the application and acceptance of this standard is still in its infancy in the province of Alberta, Canada. This paper presents a case study of one of the first protection system upgrade projects applying the IEC 61850 standard in the province. The focus of this paper is not to discuss the theoretical background of the standard itself. Rather, the purpose is to share and demonstrate the engineering steps taken and lessons learned to successfully implement a fully functional protection and control system based around IEC 61850. The complete system developed for this project includes the following elements: • 138/25kV distribution substation consisting of two power transformers and ten feeders. • Integration of 17 IEC 61850 compliant intelligent electronic devices (IED) to perform both protection and control (P&C) functions. • Substation local area network (LAN) using optical fiber for inter-panel communication and applying the parallel redundancy protocol (PRP) to achieve complete communication redundancy. • New human-machine interface (HMIs) combining supervisory control and data acquisition (SCADA) and data gateway functionality within the real-time process database of the substation hardened computer. The paper begins with a high-level overview of the substation configuration and its P&C requirements. System protection and apparatus control philosophies using the IED and HMI/gateway are described. The applications and steps adopted to engineer inter-IED communication via generic object oriented substation events (GOOSE) are discussed in details. Next, the benefits of factory acceptance testing and the scope of site commissioning taken to verify the correct operation of the system are described. The paper concludes with a lessons learned - ection comparing this project with the traditional implementation.
机译:在过去的十年IEC 61850已获得流行的各种工具在全球范围内为它的互操作性,可扩展性,可维护性和电线减少承诺。但是该标准的应用和接受程度仍处于在加拿大阿尔伯塔省处于起步阶段。本文运用呈现在全省IEC 61850标准的第一个保护系统升级项目之一的个案研究。本文的重点不是讨论标准本身的理论背景。相反,目的是分享和展示所采取的工程措施,并开始学习成功经验实现基于IEC周围61850一个全功能的保护和控制系统,用于本项目开发的完整的系统包括以下要素:•138 / 25kV的配电站由两个电力变压器和十个馈线。 •17台符合IEC 61850的智能电子设备的集成(IED)同时执行保护和控制(P& C)的功能。 •变电站局域网采用光纤用于面板间通信以及将所述并行冗余协议(PRP),以实现完整的通信冗余(LAN)。 •新的人机界面(人机界面)相结合的变电站强化计算机的实时过程数据库中的监控与数据采集(SCADA)和数据网关功能。纸张开始于变电站配置及其p&C要求的高级概述。系统保护与使用IED和HMI /网关装置控制理念进行说明。应用程序和通过工程师经由通用面向对象变电站事件(GOOSE)间IED通信步骤在细节进行讨论。接下来,调试采取工厂验收测试和现场的范围的好处,以验证所描述的系统的正确运行。论文以吸取了经验教训总结 - 挠度比较该项目与传统的实现。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号