首页> 外文会议>International conference on environmental systems >Development of Carbon Dioxide Removal Systems for Advanced Exploration Systems 2012-2013
【24h】

Development of Carbon Dioxide Removal Systems for Advanced Exploration Systems 2012-2013

机译:2012-2013年用于高级勘探系统的二氧化碳去除系统的开发

获取原文

摘要

The Atmosphere Revitalization Recovery and Environmental Monitoring (ARREM) project was initiated in September of 2011 as part of the Advanced Exploration Systems (AES) program. Under the ARREM project, CO_2 removal and associated air drying efforts are focused on improving the current state-of-the-art systems utilizing fixed beds of sorbent pellets by seeking more robust pelletized sorbents, evaluating structured sorbents, and examining alternate bed configurations to improve system efficiency and reliability. These development efforts combine sorbent screening and characterization, testing of sub-scale and full-scale systems, and multi-physics computer simulations to evaluate candidate approaches, select the best performing options, and optimize the configuration of the selected approach. The selected subsystem is then implemented in a full-scale integrated atmosphere revitalization test. This paper describes the carbon dioxide removal hardware design and sorbent screening and characterization effort in support of the ARREM project within the AES program. The development of CO_2 removal and associated air-drying subsystem models and simulations under the ARREM project is discussed in a companion paper.
机译:大气振兴恢复和环境监测(ARREM)项目于2011年9月启动,是高级勘探系统(AES)计划的一部分。在ARREM项目下,CO_2的去除和相关的空气干燥工作着眼于通过使用更坚固的粒状吸附剂,评估结构化吸附剂以及检查替代床的配置以改善吸附剂颗粒的固定床来改进当前的最新系统。系统效率和可靠性。这些开发工作结合了吸附剂的筛选和表征,次规模和全面系统的测试以及多物理场计算机仿真,以评估候选方法,选择性能最佳的选项并优化所选方法的配置。然后,在全面的大气活化测试中实施选定的子系统。本文介绍了二氧化碳脱除硬件设计以及吸附剂筛选和表征工作,以支持AES计划中的ARREM项目。伴随论文中讨论了ARREM项目下CO_2去除的开发以及相关的风干子系统模型和模拟。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号