首页> 外文会议>Annual Hawaii International Conference on System Sciences >Scrum Metrics for Hyperproductive Teams: How They Fly like Fighter Aircraft
【24h】

Scrum Metrics for Hyperproductive Teams: How They Fly like Fighter Aircraft

机译:高生产力团队的Scrum指标:他们如何像战机一样飞行

获取原文

摘要

Scrum Teams use lightweight tools like Story Points, the Burn down chart, and Team Velocity. While essential, these tools alone provide insufficient information to maintain a high energy state that yields Hyper productivity. More data is required, but data collection itself can slow Teams. This effect must be avoided when productivity is the primary marker of success. Here we describe nine metrics that can develop and sustain Hyper productive Teams -- Velocity, Work Capacity, Focus Factor, Percentage of Adopted Work, Percentage of Found Work, Accuracy of Estimation, Accuracy of Forecast, Targeted Value Increase, Success at Scale, and the Win/Loss Record of the Team. The unique contribution of this paper is to demonstrate how a light touch and lightweight strategy can be used to compare Teams with different Story Point reference scales.
机译:Scrum团队使用轻量级工具,例如Story Points,Burn down图表和Team Velocity。虽然必不可少,但仅这些工具就无法提供足够的信息来维持高能量状态,从而提高生产效率。需要更多数据,但是数据收集本身会使团队速度变慢。当生产力是成功的主要标志时,必须避免这种影响。这里我们描述了九个可以发展和维持高生产率团队的指标-速度,工作能力,关注因子,被采用工作的百分比,已找到工作的百分比,估计的准确性,预测的准确性,目标价值增长,规模成功,以及团队的胜利/失败记录。本文的独特贡献在于演示如何使用轻触和轻量策略来比较具有不同Story Point参考比例的团队。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号