首页> 外文会议>ASME international conference on ocean, offshore and arctic engineering >STUDY ON RELATIONSHIP BETWEEN COUNTERMEASURES AND PLANNING PROCESS IN CASE OF WATERFRONT REDEVELOPMENT
【24h】

STUDY ON RELATIONSHIP BETWEEN COUNTERMEASURES AND PLANNING PROCESS IN CASE OF WATERFRONT REDEVELOPMENT

机译:滨水区改造中对策与规划过程的关系研究

获取原文

摘要

Planning body may have the tendency to adopt countermeasures such as construction of infrastructures, introduction of an able execution body, and land use control after making most part of plan including goals. It should be noted that planning body must reconsider plan on the basis of adopted countermeasures, because countermeasures and goals are two sides of the same coin at the stage of execution. Such planning process is shown through the study of the planning of the redevelopment of Minato Mirai 21 area, the largest waterfront redevelopment project in Tokyo Metropolis.
机译:在制定包括目标在内的大部分计划后,计划机构可能倾向于采取对策,例如基础设施建设,引入有能力的执行机构以及土地使用控制。应当指出的是,规划机构必须在采用的对策基础上重新考虑计划,因为在执行阶段,对策和目标是同一枚硬币的两个方面。通过对东京未来最大的滨水区再开发项目港未来21区再开发计划的研究,可以看出这种规划过程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号