首页> 外文会议>Annual International Bridge Conference >Precast Integral Abutments and Superstructure Bridge: A MassDOT ABC Case Study
【24h】

Precast Integral Abutments and Superstructure Bridge: A MassDOT ABC Case Study

机译:预制整体式基台和上部结构桥梁:MassDOT ABC案例研究

获取原文

摘要

This project replaced the existing 32’-6” span cast-in-place concrete T-beambridge carrying Route 62 (Princeton Road) over the Stillwater River in Sterling, MA, with a 45-foot span rolled steel beam bridge with composite pre-cast concrete deck. Featuring precastconcrete deck panels, abutments and wingwalls, this is the first integral abutment bridge inMassachusetts constructed with all precast components. Project design, detail, criteria,construction, materials specific requirements and lessons learned are presented.
机译:该项目取代了现有的32'-6”跨度现浇混凝土T型梁 马萨诸塞州斯蒂尔沃特河上架有62号公路(普林斯顿路)的大桥,带有45- 脚跨度为轧制钢梁桥,带有复合预制混凝土甲板。具有预制 混凝土桥面板,基台和翼墙,这是美国第一座整体式基台桥 马萨诸塞州建造有所有预制组件。项目设计,详细信息,标准, 介绍了建筑,材料的具体要求和经验教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号