首页> 外文会议>Annual International Bridge Conference >Unconventional Girder Erection on the Moses Wheeler Bridge
【24h】

Unconventional Girder Erection on the Moses Wheeler Bridge

机译:摩西惠勒大桥上的非常规梁架设

获取原文

摘要

Site constraints limited the options available to erect plate girders on the I-95 MosesWheeler Bridge in Connecticut. Walsh / PCL Joint Venture and McNary Bergeron and Associatesdeveloped a unique girder erection method for Stage I of this project that incorporated cranes onthe existing bridge and temporary rolling carts to side launch girders into position. Extensiveconstruction engineering and planning was required to develop this procedure and overcomechallenges faced during construction.
机译:场地限制限制了在I-95摩西上架设板梁的可用选项 惠勒桥梁在康涅狄格。沃尔什/ PCL合资企业和McNary Bergeron and Associates 为该项目的第一阶段开发了一种独特的梁架设方法,该方法将起重机与 现有的桥和临时滚动小车将侧发射大梁固定到位。广泛的 需要制定建筑工程和规划来制定此程序并克服 施工过程中面临的挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号