首页> 外文会议>Annual International Bridge Conference >Alexander Hamilton Bridge Rehabilitation of Approach Span Superstructure
【24h】

Alexander Hamilton Bridge Rehabilitation of Approach Span Superstructure

机译:亚历山大·汉密尔顿大桥进近跨度上部结构的修复

获取原文

摘要

The Alexander Hamilton Bridge carries I-95 over the Harlem River in New York City. The $407 millionrehabilitation is the largest single-contract construction project in the New York Department of Transportation’shistory. Construction began in 2009 and will be completed this year. The project includes a new reinforcedconcrete deck and modifications to the approach superstructure while maintaining eight lanes of traffic on ahighly congested section of interstate highway in the midst of New York City. In a Value Engineering Study, newwelded plate girders were used in lieu of the intended truss girders and the proposed lateral bracing waseliminated. These changes simplified the design and construction as well as future inspection and maintenance.
机译:亚历山大·汉密尔顿大桥(Alexander Hamilton Bridge)携带I-95穿越纽约市的哈林河(Harlem River)。 4.07亿美元 修复是纽约交通局最大的单项合同建设项目 历史。建设工作于2009年开始,今年将完成。该项目包括一个新的加固 混凝土甲板和对进近上层建筑的改造,同时在一个航道上保持8条车道 纽约市中州际公路的高度拥挤路段。在价值工程研究中,新 使用焊接板梁代替预期的桁架梁,建议的横向支撑为 被淘汰。这些更改简化了设计和构造以及将来的检查和维护。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号