首页> 外文会议>International Conference and Exhibition on Electricity Distribution >PERFORMANCE AND DESIGN OF OVER HEAD LV BUNDLE CONDUCTOR SYSTEMS IN AN ENVIRONMENT OF HIGH LIGHTNING ACTIVITY AND HIGH POLLUTION
【24h】

PERFORMANCE AND DESIGN OF OVER HEAD LV BUNDLE CONDUCTOR SYSTEMS IN AN ENVIRONMENT OF HIGH LIGHTNING ACTIVITY AND HIGH POLLUTION

机译:高雷电活动环境中HEAD LV束导体系统的性能和设计

获取原文

摘要

Eskom participates in South Africa's electrification program which started in 1992 and is still continuing. Eskom made 350 000 connections per year at the peak of the program. Eskom lead the industry in reducing first capital costs in the program by more than 50%. [1] This cost reduction was achieved by ensuring efficiency and effectiveness of the technology, the design process as well as the logistics and construction and sales processes. This was done without increasing operating costs and maintaining the same levels of reliability. This paper discusses one of the technology choices that were made and problems that are being experienced currently with LV bundle conductor in especially high lighting activity areas where pollution is prevalent. The paper discusses the mechanisms that lead to the problem as well as the solutions to the problem.
机译:Eskom参加了南非的电气化计划,该计划于1992年开始,仍在继续。 ESKOM每年在该计划的峰值上进行350 000个连接。 ESKOM引领行业降低了该计划的第一资本成本超过50%。 [1]通过确保技术的效率和有效性,设计过程以及物流和建筑和销售流程来实现这种成本降低。这是在不增加运营成本并维持相同的可靠性水平的情况下进行的。本文讨论了污染普遍存在普遍存在的高度照明活动区域的LV束导体的制作和问题所在的技术选择之一。本文讨论了导致问题的机制以及解决问题的解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号