首页> 外文会议>International Conference and Exhibition on Electricity Distribution >INTEGRATION OF LARGE-SCALE WINDFARMS INTO THE GERMAN GRID
【24h】

INTEGRATION OF LARGE-SCALE WINDFARMS INTO THE GERMAN GRID

机译:将大型Windfarms集成到德国网格中

获取原文

摘要

The share of renewable energy, particularly of wind energy will grow essentially in the near future. In Germany it is planned to extend the windpower generation from about 14.000 MW at present to 45.000 - 50.000 MW in 2030. In the past wind power generation was located in MV distribution networks with relatively small sized windfarms below 100 MW. The new tendency is to install large power off shore windfarms with hundreds of MW power size. This new development results in a number of new issues to be solved in the near future. German utilities regard in their grid codes large windfarms as a large conventional power station. Consequently it is demanded that windfarms remain in operation after fault clearance in case of faults located near to the windfarm grid connecting point, taking into account conventional protection relay settings. This cannot be fulfilled at present by most of windmill types. New technology like a crowbar is necessary to fulfill the grid code demands.
机译:可再生能源的份额,尤其是风能的份额基本上在不久的将来生长。在德国,计划将当前约14.000兆瓦的风力发电扩展到2030年。在过去的风力发电中位于MV分销网络中,尺寸在100兆瓦以下的尺寸相对小的风渣。新趋势是使用数百MW电源尺寸安装大型电源。这一新的发展导致了一些在不久的将来解决的新问题。德国公用事业公司将其网格代码大型风渣作为一个大型传统电站。因此,需要在靠近Windfarm网格连接点的故障情况下发生故障后的WindFarms在发生故障后,考虑到传统的保护继电器设置。大多数风车类型目前不能满足这一点。像撬棍一样的新技术是满足网格代码需求所必需的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号