首页> 外文会议>International Conference and Exhibition on Electricity Distribution >DISTRIBUTED SUBSTATIONS: AN INNOVATIVE LOW IMPACT SOLUTION
【24h】

DISTRIBUTED SUBSTATIONS: AN INNOVATIVE LOW IMPACT SOLUTION

机译:分布式变电站:创新的低影响解决方案

获取原文
获取外文期刊封面目录资料

摘要

While searching for solutions to minimize environmental impact of substations and improve efficiency in services by optimizing costs, AES Eletropaulo promoted an R&D project to implement smaller substations, which are operationally integrated with feeders and amongst each other, in such a way as to optimize power reserve capacity. ENERQ/USP, ABB and Themag, were invited to take part in this project, thus establishing an attractive partnership in which the Utility describes the problem, criticizes alternatives and evaluates application feasibility; the University researches and shapes solution proposals; the Manufacturer develops proposals and equipment and; finally, the Designer materializes the solution. This article presents the methodology and the results obtained, and describes solution implementation in a pilot area. Methodology involves an innovative method in the evaluation of substation alternatives, which contemplates objective issues in direct manner, and intangible issues through structured specialist analysis. Analysis of the grid, which functions as "distributed substation" "interconnection bus", allowed for optimum location of re-connectors and maneuver switches, maximizing continuity and operational ease. The pilot project is being implemented in the region of Cotia, Sao Paulo, where strong environmental restrictions prevent penetration of high voltage lines within load center and 34.5kV power is available at neighboring substations.
机译:在寻找解决方案以最大限度地减少变电站的环境影响并通过优化成本提高服务效率,AES Eletropaulo促进了研发项目,实现了较小的变电站,该项目与馈线和彼此一起使用,以优化电源储备的方式容量。邀请ENERQ / USP,ABB和Themag参加该项目,从而建立了有吸引力的伙伴关系,其中本实用程序描述了该问题,批评替代品并评估应用可行性;大学研究和塑造解决方案提案;制造商开发提案和设备;最后,设计师实现了解决方案。本文介绍了方法和结果,并描述了试验区中的解决方案。方法涉及一种在评估变电站替代方案中的创新方法,该方法通过结构性专家分析来实现以直接方式的客观问题和无形问题。网格分析,用作“分布式变电站”“互连总线”,允许重新连接器和机动开关的最佳位置,最大化连续性和操作易操作。试点项目正在北保罗的科迪亚地区实施,其中强大的环境限制防止负载中心内的高压线路渗透,相邻变电站可获得34.5kV的功率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号