Distributed substations: An innovative low impact solution

机译:分布式变电站:创新的低影响解决方案

获取原文

摘要

While searching for solutions to minimize environmental impact of substations and improve efficiency in services by optimizing costs, AES Eletropaulo promoted an Ron6;D project to implement smaller substations, which are operationally integrated with feeders and amongst each other, in such a way as to optimize power reserve capacity. ENERQ/USP, ABB and Themag, were invited to take part in this project, thus establishing an attractive partnership in which the Utility describes the problem, criticizes alternatives and evaluates application feasibility; the University researches and shapes solution proposals; the Manufacturer develops proposals and equipment and; finally, the Designer materializes the solution. This article presents the methodology and the results obtained, and describes solution implementation in a pilot area. Methodology involves an innovative method in the evaluation of substation alternatives, which contemplates objective issues in direct manner, and intangible issues through structured specialist analysis. Analysis of the grid, which functions as “distributed substation” “interconnection bus”, allowed for optimum location of re-connectors and maneuver switches, maximizing continuity and operational ease. The pilot project is being implemented in the region of Cotia, São Paulo, where strong environmental restrictions prevent penetration of high voltage lines within load center and 34.5kV power is available at neighboring substations.
机译:AES Eletropaulo在寻找解决方案以最大程度地降低变电站对环境的影响并通过优化成本提高服务效率的同时,发起了一个Ron6; D项目,以实施规模较小的变电站,这些变电站与支线架以及彼此之间集成在一起,以实现优化的方式动力储备能力。 ENERQ / USP,ABB和Themag被邀请参加该项目,从而建立了一种有吸引力的合作伙伴关系,公用事业公司在其中描述问题,批评替代方案并评估应用程序的可行性;大学研究并制定解决方案建议;制造商制定建议和设备,并且;最后,设计师将解决方案具体化。本文介绍了方法和获得的结果,并介绍了在试验区域中的解决方案实施。方法论涉及一种评估变电站替代方案的创新方法,该方法以直接的方式考虑客观问题,并通过结构化的专家分析来考虑无形的问题。对作为“分布式变电站”,“互连总线”的电网的分析可以实现重新连接器和操纵开关的最佳位置,从而最大程度地提高了连续性和操作的便利性。该试点项目正在圣保罗的科蒂亚地区实施,该地区严格的环境限制阻止高压线渗入负载中心,附近的变电站可提供34.5kV的电力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号