首页> 外文会议>IFIP WG 5.5 working conference on virtual enterprises >How to Achieve Dynamic and Flexible Performance Management Systems for Collaborative Processes
【24h】

How to Achieve Dynamic and Flexible Performance Management Systems for Collaborative Processes

机译:如何实现协作过程的动态,灵活的绩效管理系统

获取原文

摘要

One of the main characteristics of successful collaborative networks is their ability to continuously reformulating their processes. The, they can quickly get adapted to environment needs and therefore define more competitive processes. One of biggest weaknesses of Performance Management Systems (PMS) when dealing with collaborative processes associated to collaborative networks, is their low degree of both dynamicity and flexibility to get adapted to the changes that such collaborative processes experiment. The main changes that can take place are, among others, small or large modifications of the own processes, entrance and/or exit of new participants in the process, incorporation and/or elimination of processes, changes in objectives and/or strategies of processes of some participant, or even of the whole collaborative network, etc. All this brings continuous modifications over the components that conform the PMS. Then, it is necessary to structure certain mechanisms that will provide with both dynamicity and flexibility to the PMS. Otherwise, these PMS will become obsolete in the short-time and will be not useful anymore. Further, these PMS will not measure properly performance and then they will become ineffective, becoming the source of troubles. Scientific literature shows that most of the works that deal with PMS dynamicity and flexibility are focused on intra-organizational contexts, leaving almost apart the collaborative networks ambit. This work analyses those aspects that prevent to the PMS to be dynamic and flexible when applied to manage the performance of collaborative networks. In addition, we discuss and analyse several mechanisms that should be incorporated into the PMS, making them more dynamic and flexible.
机译:成功的协作网络的主要特征之一是其不断重新制定其流程的能力。他们可以迅速适应环境需求,从而定义更具竞争力的流程。绩效管理系统(PMS)在处理与协作网络相关联的协作过程时的最大弱点之一是它们的动态性和灵活性都较低,无法适应这种协作过程所进行的更改。可能发生的主要更改包括:自身流程的小或大修改,流程中新参与者的进入和/或退出,流程的合并和/或消除,流程的目标和/或策略的更改。所有参与者,甚至整个协作网络等等。所有这些都对符合PMS的组件进行了不断的修改。然后,有必要构建某些机制,该机制将为PMS提供动态性和灵活性。否则,这些PMS将在短时间内过时并且不再有用。此外,这些PMS将无法正确地衡量性能,然后它们将变得无效,成为麻烦的根源。科学文献表明,处理PMS动态性和灵活性的大多数工作都集中在组织内部环境中,几乎没有协作网络的范围。这项工作分析了那些在应用于管理协作网络性能时阻止PMS动态和灵活的方面。此外,我们讨论和分析了应该整合到PMS中的几种机制,从而使它们更具动态性和灵活性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号