首页> 外文会议>Triannual international conference on ports >Load Test Procedures for In-Service Shiploaders
【24h】

Load Test Procedures for In-Service Shiploaders

机译:在役装船者的载荷测试程序

获取原文

摘要

The regulatory body that sets and monitors port and marine facility service standards in Canada, Transport Canada, now requires that in-service load tests prescribed in the Canada Shipping Act be applied to bulk material shiploaders that have historically only been load tested during initial commissioning as proof of the design and construction prior to entering service. Load testing requirements include applying a Test Load equal to between 110% and 125% of the Safe Working Load (SWL) over the full range of machine motions, and these tests must be carried out every 5 years. The codes and standards used to design these machines do not require that lateral loads associated with the movements of the machine be taken into consideration in combination with significant loads, which were considered to be applied either statically or independent of other special loads. The SWL of the machine must first be determined, which represents the loads that could reasonably be foreseen as being applied to a machine over its operating life, typically a point load applied at the boom tip in combination with a number of distributed loads applied over the length of the boom. To verify the appropriateness of the SWL, detailed structural modeling is undertaken or original design loads and drawings are reviewed, if available, and a detailed visual, non-destructive condition assessment of the machine is completed. Finally, several methods have been developed to efficiently apply the Test Load in a manner that simulates the factored maximum in-service loads estimated to occur over the operating life of a machine. This paper is not intended to be a comprehensive manual on undertaking load tests on in-service shiploaders. Persons performing such tests must make their own determinations and assume sole responsibility for testing procedures, requirements and results.
机译:在加拿大运输部制定和监控加拿大港口和海洋设施服务标准的监管机构,现在要求将《加拿大运输法》规定的在役载荷测试应用于历史上仅在初次调试期间进行过载荷测试的散装物料装船商。投入使用之前,必须对设计和施工进行证明。负载测试要求包括在整个机器运动范围内施加等于安全工作负载(SWL)的110%至125%的测试负载,并且这些测试必须每5年进行一次。用于设计这些机器的规范和标准不要求将与机器运动相关的侧向载荷与显着载荷结合起来考虑,这些载荷被认为是静态施加的,或者独立于其他特殊载荷施加。首先必须确定机器的SWL,该SWL表示可以合理预见的在整个机器使用寿命期间施加到机器上的负载,通常是施加在动臂末端的点负载,再加上施加在机器臂上的许多分布式负载。动臂的长度。为了验证SWL的适用性,进行了详细的结构建模,或者检查了原始设计负荷和图纸(如果有),并且完成了详细的视觉,无损机器状态评估。最后,已开发出几种方法来有效地施加测试负载,该方法可以模拟在机器的整个使用寿命期间估计发生的分解后的最大使用中负载。本文无意成为在役船上进行载荷测试的综合手册。进行此类测试的人员必须做出自己的决定,并对测试程序,要求和结果承担全部责任。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号