首页> 外文会议>Triannual international conference on ports >Practical Implementation of Marine Concrete Specifications for Waterfront Structures
【24h】

Practical Implementation of Marine Concrete Specifications for Waterfront Structures

机译:海滨结构海洋混凝土规范的实际实施

获取原文
获取外文期刊封面目录资料

摘要

The U.S. Navy has developed and implemented design and quality assurance procedures intended to improve the quality and durability of new marine concrete construction. Several Navy piers constructed according to this guidance have exposed opportunities to refine the government guidance to provide a more balanced approach to concrete mixture design criteria. Recent changes made to the guidance provides concrete producers freedom to innovate and optimize concrete mixtures. This optimization enables architects, engineers and contractors to accomplish more sustainable concrete structures through the allowance of greater amounts of supplemental cementing materials as a partial replacement to portland cement in the concrete mixture. Quality Assurance procedures have been streamlined to cost less and take less time while enhancing confidence that the completed structure will meet its service life expectations. Lessons learned have been summarized and form the basis for many significant changes that are being incorporated into revisions of the Uniform Facilities Guide Specification (UFGS) 03 31 29, Marine Concrete. The methodology for the implementation of the Marine Concrete specification needs to take into account a variety of practical considerations, such as: material supplier limitations, schedule and cost constraints, and an industry-wide lack of familiarity with the unique requirements of this guide specification. In all cases, early communication between the Owner, engineer and construction contractor is required for a successful outcome. This paper will use the Pier 31 Replacement project for the U.S. Navy at Naval Submarine Base New London in Groton, Connecticut as a case study for the implementation of the Marine Concrete specification. The implementation efforts described in this paper will be of interest to conference attendees since it highlights some important revisions to the UFGS.
机译:美国海军已经制定并实施了旨在提高新型船用混凝土结构质量和耐久性的设计和质量保证程序。根据该指南建造的几个海军码头暴露了改进政府指南的机会,从而为混凝土混合物设计标准提供了更为平衡的方法。对指南的最新更改为混凝土生产商提供了创新和优化混凝土混合物的自由。这种优化使建筑师,工程师和承包商可以通过允许使用更多的补充胶结材料作为混凝土混合物中的硅酸盐水泥的部分替代品,来实现更具可持续性的混凝土结构。简化了质量保证程序,以降低成本并减少时间,同时增强对已完成结构将达到其使用寿命预期的信心。已总结的经验教训构成了许多重要变化的基础,这些变化已纳入《统一设施指南规范》(UFGS)03 31 29(船用混凝土)的修订版中。实施《海洋混凝土规范》的方法需要考虑多种实际考虑因素,例如:材料供应商限制,进度和成本限制,以及整个行业对本指南规范的独特要求缺乏了解。在所有情况下,业主,工程师和建筑承包商之间必须尽早沟通,以取得成功的结果。本文将使用美国海军在康涅狄格州格罗顿的新伦敦海军潜艇基地的Pier 31替换项目作为实施海洋混凝土规范的案例研究。由于本文着重介绍了UFGS的一些重要修订,因此本文所描述的实施工作将使与会人员感兴趣。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号