首页> 外文会议>Triannual international conference on ports >Accelerated Bridge Construction (ABC) Techniques for Heavy Lift (HL) Materials Off-Loading Facility (MOF)
【24h】

Accelerated Bridge Construction (ABC) Techniques for Heavy Lift (HL) Materials Off-Loading Facility (MOF)

机译:加速桥梁施工(ABC)重型升降机(HL)和材料卸载设施(MOF)技术

获取原文

摘要

This paper explores how Accelerated Bridge Construction (ABC) strategies developed for regions of moderate to high seismicity are suitable for heavy-lift construction logistics wharves intended to serve new industrial projects such as LNG terminals in British Columbia. Many industrial facilities require a heavy lift construction logistics wharf for off-loading construction equipment and large preassembled process modules weighing thousands of tonnes each. The logistics wharf is often needed early in the project construction sequence, favouring the use of expedited construction techniques, consistent with maintaining suitable design and seismic performance criteria. This paper highlights aspects of the engineering design of the Heavy Lift (HL) Materials Off-loading Facility (MOF) to serve as a multipurpose deep water logistics wharf. The MOF will accommodate the simultaneous berthing of two large vessels: a RO/RO vessel, to accommodate multi-axle Self Propelled Modular Transporters (SPMT) off-loaded by the stern; and a heavy lift general cargo vessel berthed on its side.
机译:本文探讨了适用于中度至高地震区的地区开发的加速桥梁建设(ABC)策略适用于旨在为不列颠哥伦比亚省的LNG终端等新工业项目提供服务的重型建筑物流码头。许多工业设施需要沉重的升降机建筑物流码头,用于卸载施工设备,大量的预装配工艺模块,每个工艺模块每增加数千吨。物流码头往往在项目建设序列中早期需要,有利于使用加速施工技术,符合保持合适的设计和地震性能标准。本文突出了重型升降机(HL)材料的工程设计方面的卸载设施(MOF)作为多用途深水物流码头。 MOF将容纳两艘大容器的同时停靠:RO / RO船只,以容纳由船尾的多轴自推进模块化运输扣(SPMT);和一个沉重的升降机通用货物船在其侧面停泊。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号