Cost-Effective Design of a Marina Breakwater Using Horizontal Sheet Piling

机译:使用水平纸张堆积的Marina防堤的经济高效设计

获取原文

摘要

The City of Chelan's Don Morse Park is a 40-acre public park on the south shore of Lake Chelan in central Washington. The park provides more than 2,000 feet of shoreline public access. The City expanded the marina in 2013 by installing a new breakwater and additional moorage facilities. The City had limited funds for the project and was looking for cost-effective measures to reduce overall project costs while increasing moorage opportunities. The existing marina was expanded by removing a section of existing breakwater and expanding the marina parallel to the shoreline. In order to reduce project costs, an innovative design was implemented that used horizontal steel sheet piling bolted to vertical steel H-piling and battered pipe piling for the vertical-wall breakwater. This innovative application of a common construction material reduced the overall construction costs significantly and expedited the construction schedule to allow the park to open in time for the summer season while providing the protection needed for the marina from the high wave exposure at the site.
机译:Chelan Con的Don Morse Park市是华盛顿中部Chelan湖南岸的40英亩公园。该公园提供超过2000英尺的海岸线公共访问。这座城市通过安装新的防水和额外的系泊设施,在2013年扩大了码头。该市为该项目提供了有限的资金,并正在寻找成本效益的措施,以减少整体项目成本,同时增加停泊机会。通过去除现有防波堤的一部分并与海岸线扩展码头,扩大现有的码头。为了降低项目成本,实施了一种创新的设计,使使用螺栓固定在垂直墙体防波堤上的垂直钢H堆叠和受打击管道的卧式钢板堆积。这种普通建筑材料的这种创新应用显着降低了整体施工成本,并加快了施工时间表,让公园在夏季开放时间,同时提供码头从现场的高波曝光所需的保护。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号