首页> 外文会议>International Conference on Environment and Electrical Engineering >Interconnected Power System Transmission Corridors Case study: West and South-West side of the Romanian Power System
【24h】

Interconnected Power System Transmission Corridors Case study: West and South-West side of the Romanian Power System

机译:相互连接的电力系统传动走廊案例研究:罗马尼亚电力系统西部和西南方

获取原文

摘要

The objective of unifying the electricity networks to create a single electricity market represents a complex process. Thus, it requires simplification. In last years, a large number of State Members consider transmission corridors being an optimal solution for integration into a common electricity market. Currently, real power exchanges between regions are achieved through another intermediary region. This paper contains an analysis of transmission cost allocation to market participants in case of indirect transfer using an interconnected system. Case study is carried on a real system, including west, southwest and northwest parts of the Romanian Power System.
机译:统一电力网络创建单一电力市场的目标是复杂的过程。因此,它需要简化。在过去的几年里,大量的州成员考虑传输走廊是集成到公共电力市场的最佳解决方案。目前,区域之间的实际功率交换通过另一个中介区域实现。本文在使用互连系统间接转移的情况下,对市场参与者的传输成本分配分析。案例研究是在罗马尼亚电力系统的西部,西南和西北部门的真实系统上进行的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号