首页> 外文会议>ASME international manufacturing science and engineering conference >MIXED-MODEL ASSEMBLY LINE SEQUENCING OPTIMIZATION BASED ON WORKSTATION OVERLOAD ANALYSIS
【24h】

MIXED-MODEL ASSEMBLY LINE SEQUENCING OPTIMIZATION BASED ON WORKSTATION OVERLOAD ANALYSIS

机译:基于工作站超载分析的混合模型装配线优化

获取原文

摘要

Reasonable task sequencing will be benefit for both productivity and industry energy saving. Mixed-model products assembly sequencing of mass customization manufacturing systems significantly affects material requirements, order delivery time, and manufacturing cost. A new approach for products sequencing of mixed model assembly line (MMAL) according to workstations overload analysis based on historical production data is proposed to obtain the optimized assembly sequence with the objectives of minimizing consumption waviness of each material, assembly line setup cost, and order delivery time. It will be efficient to cut down the assembly line blockage time, improve the assembly productivity, and save industry energy. A multi-objective optimization algorithm based on particle swarm is developed. An industrial case study has been performed in order to demonstrate the practicality and effectiveness of the proposed approach.
机译:合理的任务排序将有利于提高生产率和行业节能。大规模定制制造系统的混合模型产品组装顺序会严重影响材料要求,订单交付时间和制造成本。提出了一种基于历史生产数据根据工作站过载分析对混合模型装配线(MMAL)进行产品排序的新方法,旨在获得优化的装配顺序,以最小化每种材料的消耗波动,装配线设置成本和订单为目标。交货时间。减少装配线阻塞时间,提高装配生产率并节省行业能源将是高效的。提出了一种基于粒子群的多目标优化算法。为了证明所提出方法的实用性和有效性,已经进行了工业案例研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号