首页> 外文学位 >Sequencing mixed-model assembly lines in a lean environment.
【24h】

Sequencing mixed-model assembly lines in a lean environment.

机译:在精益环境中对混合模型装配线进行排序。

获取原文
获取原文并翻译 | 示例

摘要

Mixed-model assembly lines are used when more than one model of a product family is produced simultaneously on a single assembly line. The amount of work required to assemble units varies from model to model, creating an unbalanced flow of work along the line. One aspect of a lean production environment that differs significantly from traditional assembly is that the line is stopped whenever the prescribed work cannot be completed within the station boundaries in the allotted time. This research examines the problem of sequencing the jobs on a mixed-model assembly line in order to minimize makespan.;A concise math model for the problem is given along with a discussion of supporting research and model accuracy. A dominant sequence characteristic, referred to as stacking, is proven. This characteristic is used to develop optimal solution procedures for certain special cases of the problem. A robust construction-improvement heuristic was developed for solving the generalized sequencing problem. The first phase of the heuristic solution procedure constructs a sequence with a high degree of stacking. The constructive phase is complimented by an improvement phase, which uses a global search heuristic to find better solutions.;The dissertation also examines the problem with assembly worker pacing. Workers can speed up and complete long operations in a shorter amount of time, thereby preventing some instances of line stoppage. This limited ability to work faster when necessary greatly complicates the problem. An updated math model, which incorporates work pacing, is developed. Necessary and sufficient conditions for the existence of a zero stoppage sequence for a single station are established.
机译:当在单个装配线上同时生产多个产品系列的模型时,将使用混合模型装配线。组装单元所需的工作量因模型而异,从而沿生产线产生了不平衡的工作流程。精益生产环境的一个方面与传统装配有很大不同,那就是只要规定的工作无法在分配的时间内在站点范围内完成,生产线就会停止。这项研究研究了在混合模型装配线上的作业排序问题,以最大程度地减少了制造周期。给出了该问题的简洁数学模型,并讨论了支持研究和模型准确性的问题。已经证明了主要的序列特征,称为叠加。此特性用于针对某些特殊情况开发最佳解决方案。为了解决广义排序问题,开发了一种健壮的构造改进启发式算法。启发式求解过程的第一阶段将构建一个具有高度堆叠性的序列。建设性阶段与改进阶段相辅相成,改进阶段使用全局搜索启发式方法找到更好的解决方案。本文还研究了装配工人起搏的问题。工人可以在更短的时间内加快并完成长时间的操作,从而避免某些生产线停顿的情况。这种有限的能力(在必要时可以更快地工作)使问题变得更加复杂。开发了一个更新的数学模型,其中包含工作节奏。建立了一个单站存在零停止序列的充要条件。

著录项

  • 作者

    Flynn, Timothy John.;

  • 作者单位

    The University of Alabama.;

  • 授予单位 The University of Alabama.;
  • 学科 Mathematics.;Industrial engineering.
  • 学位 Ph.D.
  • 年度 2003
  • 页码 166 p.
  • 总页数 166
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 11:46:01

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号