This paper presents the investigation of 10-Year Network Development Plan (TYNDP) of ENTSO/E CESA countries for the planning period between 2010–2020, concentrating on transmission enforcement needs pointed for the Balkan region. The correlation between those transmission enforcements and the growing oscillations on the weak tie-lines of the Balkan countries particularly after the interconnection of Turkey with the ENTSO/E is discussed. The complaints of the Balkan countries due to growing power oscillations are also discussed considering the tie-line enforcement needs emphasized in the TYNDP report. The sufficiency of current tie-lines between Turkey and ENTSO/E is analyzed in the sense of inter-area oscillations based on computer simulations.
机译:本文介绍了2010 - 2010年2010 - 2020年期间计划期间的10年网络发展计划(Tyndp),专注于巴尔干地区指出的传输执法需求。讨论了在土耳其与OENTO / E互连之后,那些传输实施与BALKAN国家的弱系数之间的宽度振荡之间的相关性。考虑到Tyndp报告中强调的钢铁执法需求,还讨论了由于电力振荡而导致的巴尔干国家的投诉。基于计算机模拟的区域间振荡的感觉分析了土耳其与ONTEO / E之间的当前扎线的充分性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号