首页> 外文会议>International Conference on Information Management, Innovation Management and Industrial Engineering >The Relationship of Critical Risk Factors in Chinese PPP Projects: Modeling Perspective
【24h】

The Relationship of Critical Risk Factors in Chinese PPP Projects: Modeling Perspective

机译:中国PPP项目危险风险因素的关系:建模视角

获取原文

摘要

Public Private Partnerships (PPPs) have been applied for twenty years in China. Many problems of PPP projects in China are related to unsuccessful risk management. This paper addresses modeling the critical risk factors (CRFs) that have been identified from the Chinese PPP projects based on a questionnaire survey. The aim of this paper is to find the relationship between the CRFs according to the classification of these CRFs during the lifecycle of Chinese PPP projects. The method of Structure Equation Model (SEM) is used to analyze the hypothesis. The results show that there are positive cause-and-effect collections between the physical and process-related CRFs and couple of positive interaction relationships within physical CRFs. The results suggest that the private sectors in Chinese PPP projects should keep long term and stable good relationship with Chinese government. On the other hand, the public sectors should also select the one who has the best capability to control the potential risks.
机译:公共私人合作伙伴关系(PPP)已在中国申请二十年。中国PPP项目的许多问题都与不成功的风险管理有关。本文根据调查问卷调查,本文旨在建模已从中国PPP项目中确定的危险风险因素(CRF)。本文的目的是根据这些CRF在中国PPP项目的生命周期中找到CRF之间的关系。结构方程模型(SEM)的方法用于分析假设。结果表明,物理和过程相关的CRF和物理CRF内的积极相互作用关系之间存在积极的因果和效应集合。结果表明,中国PPP项目中的私营部门应保持与中国政府的长期和稳定的良好关系。另一方面,公共部门还应选择具有控制潜在风险的最佳能力的人。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号