Research on Duration Estimation of Ling Shan Tunnel Engineering

机译:凌山隧道工程持续时间估计研究

获取原文

摘要

The South-to-North Water Diversion is a tough and groundbreaking project of a province. Ling Shan tunnel is a key engineering which has many uncertain factors and complex problems in construction. In order to implement the project smoothly, is worth to research how to establish a scientific and reasonable construction schedule. The paper is based on the data of five similar tunnel engineerings, applying information diffusion theory to the construction progress network diagram so as to estimate main work time and determine the key circuit. Therefore, the project managers can calculate the total duration of Ling Shan tunnel engineering more accurately and offer reliable evidence for the follow-up engineerings.
机译:南北进出口转让是一个省的艰难和突破性的项目。凌山隧道是一个关键工程,在建设中具有许多不确定因素和复杂问题。为了顺利实施项目,值得研究如何建立科学合理的施工时间表。本文基于五个类似的隧道工程的数据,将信息扩散理论应用于施工进度网络图,以便估计主工作时间并确定关键电路。因此,项目经理可以更准确地计算凌山隧道工程的总持续时间,为后续工程提供可靠的证据。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号