首页> 外文会议>Transportation Research Board Annual meeting >Risk-based Protocol for the Inspection of Transportation Construction Projects
【24h】

Risk-based Protocol for the Inspection of Transportation Construction Projects

机译:基于风险的交通建设项目检查协议

获取原文

摘要

In the last decade, state departments of transportation (DOTs) in the U.S. haveexperienced an increase in their construction projects, while the level of their in-houseinspection staff and resources has either remained the same or declined. In response tothis challenge, some states have adopted strategies to deal with the situation, such asoutsourcing the inspection of construction activities and using quality control andquality assurance certification programs. Previous studies have found that one strategythat may reduce the inspection workload is prioritizing construction activities forinspection. However, reducing the number of inspections also has its risks, such asfunctional failures and reduced design life. Thus, available inspection resources shouldbe allocated to the activities with significant risk consequences if inspection of them isreduced. The objective of this paper is to develop a risk-based inspection protocol tofacilitate efficient allocation of available inspection resources to minimize the risksassociated with reduced inspection. First, the risk consequences associated withreduced inspection are identified for various construction activities linked totransportation projects. These risk consequences include short and long-term functionalfailures, reduced design life, reduced safety, and increased maintenance cost. Based ondata collected from 23 state DOTs, 58 engineers and inspectors from the IndianaDepartment of Transportation (INDOT), and 20 inspection consultants in the Midwest,the subjective perceived probabilities associated with the occurrence of each riskconsequence are encoded using fuzzy analysis, from which the risk impacts due toreduced inspection are obtained. The construction activities subsequently areprioritized based on the risk impacts associated with reduced inspection into fivepriority levels: high, medium-high, medium, medium-low, and low. The greater therisk impacts are due to reduced inspection, the higher the priority would be forinspection of that activity. Thus, the proposed protocol could be used for resourceallocation based on the risk impacts. The proposed list of prioritized constructionactivities could assist project and program managers in better allocating their limitedinspection resources while reducing the risks due to reduced inspection.
机译:在过去的十年中,美国的州交通运输部(DOT) 经历了他们的建设项目增加,而他们的内部水平 检查人员和资源保持不变或下降。回应 面对这一挑战,一些州已经采取了应对策略,例如 外包施工活动检查并使用质量控制和 质量保证认证计划。先前的研究发现一种策略 可能会减少检查工作量的工作重点是 检查。但是,减少检查次数也有其风险,例如 功能故障并缩短设计寿命。因此,可用的检查资源应 如果对活动进行检查,则将其分配给具有重大风险后果的活动 减少。本文的目的是开发一种基于风险的检查协议,以 促进有效分配可用的检查资源以最大程度地降低风险 与减少检查有关。一,与之相关的风险后果 确定了与以下项目有关的各种建筑活动的减少的检查 运输项目。这些风险后果包括短期和长期的职能 故障,缩短设计寿命,降低安全性并增加维护成本。基于 从印第安纳州的23个州交通运输部,58位工程师和检查员那里收集的数据 运输部(INDOT)和中西部地区的20名检验顾问, 与每种风险的发生有关的主观感知概率 使用模糊分析对结果进行编码,由于 减少检查。随后的施工活动是 根据与减少检查相关的风险影响将优先级分为五级 优先级:高,中高,中,中低和低。越大 风险影响是由于减少了检查,因此优先级越高 检查该活动。因此,建议的协议可用于资源 根据风险影响进行分配。优先施工的拟议清单 活动可以帮助项目和计划经理更好地分配其有限的资源 检查资源,同时减少因减少检查而带来的风险。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号