Risk-Based Benefit-Cost Analysis of Information Technology Tools for Program Management

机译:用于计划管理的信息技术工具的基于风险的收益成本分析

获取原文

摘要

The authors used a risk-based benefit-cost approach to evaluate the impact of nineinformation technology (IT) tools on a $1.3 billion bridge repair and replacement program.The IT systems include four tools based on geographic information systems, two documentcontrol systems, and three other reporting and database systems. The risk-based approachallowed us to deal with the uncertainties around staff time savings and other factors that areimprecise and subject to variation. Taken as a whole, the programs had a positive benefit-costratio, although four of the programs individually did not generate enough benefits to covertheir costs. Most of the tangible benefits of these systems were the result of time savings byagency staff and contractors. The paper concludes that organizational structure, contractualand legal requirements, timing and coordination with existing IT systems are critical factorsaffecting the benefits of IT systems in support of major transportation programs.The major contribution of this paper is to demonstrate the application of benefit-costanalysis and risk-based approaches, which have commonly been used in transportationproject evaluation, to the evaluation of IT systems in support of a transportation program.
机译:作者使用基于风险的利益成本方法评估了九种方法的影响。 信息技术(IT)工具进行13亿美元的桥梁维修和更换计划。 IT系统包括基于地理信息系统的四个工具,两个文档 控制系统以及其他三个报告和数据库系统。基于风险的方法 使我们能够处理节省员工时间和其他因素的不确定性 不精确且可能会有所变化。从总体上看,这些计划的收益成本为正 比率,尽管其中四个计划单独产生的收益不足以弥补 他们的费用。这些系统的大多数实际好处是节省时间的结果。 代理商人员和承包商。本文的结论是,组织结构,契约性 法律要求,与现有IT系统的时间安排和协调是关键因素 影响IT系统在支持主要运输计划中的收益。 本文的主要贡献是证明利益成本的应用 分析和基于风险的方法,这些方法通常在运输中使用 项目评估,以评估IT系统以支持运输计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号