首页> 美国政府科技报告 >Development of Prototype Software for Risk-Based Benefit-Cost Analysis of MajorRehabilitation Proposals. Phases 1 and 2
【24h】

Development of Prototype Software for Risk-Based Benefit-Cost Analysis of MajorRehabilitation Proposals. Phases 1 and 2

机译:基于风险的重大康复建议收益成本分析原型软件的开发。阶段1和2

获取原文

摘要

This report documents the work done on the enhancement of a prototype simulationmodel for the risk-based economic analysis of proposals for major rehabilitation projects of Corps of Engineers' facilities during the period from September 1993 through October 1994. The original concept, design, and prototype development of the model began in December 1992 and the initial phase of the work, the building and testing of a Phase I prototype, concluded in August 1993, with an implemented prototype. This work was documented in an un-published technical report for the Institute for Water Resources, parts of which are abstracted herein. The success of the initial model development, in particular in terms of ease of use, flexibility and speed of operation as compared to existing, spread-sheet based methods, led to the determination to pursue further prototype development. The current work, Phase II, included additional efforts involving review of existing rehabilitation proposals, enchancement of the model, enhancement of the user interface, and conceptual design and proof-of-concept testing of a model oriented towards navigation projects.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号