Dealing With Contractor’s Schedules That Cannot be Approved

机译:处理无法批准的承包商的时间表

获取原文

摘要

Too many projects start without approved schedules, and sometimes theschedules are never approved. This raises risks to both the contractor and the owner.However, if the risks of approving the schedule are higher than the risks and benefits to theproject of approving that schedule, the schedule should be rejected. In the case of rejection,knowing what to do and how to deal with a project that does not have an approved schedule inplace can be very important to the success of the project and protection of the two party’sinterests. This paper addresses the very difficult choices when a schedule is submitted that issubstandard and should not be approved.
机译:太多的项目在没有批准的时间表的情况下开始,有时 时间表永远不会被批准。这给承包商和业主都带来了风险。 但是,如果批准时间表的风险高于 批准该进度表的项目,应拒绝该进度表。在拒绝的情况下, 知道该怎么做以及如何处理一个没有批准时间表的项目 位置对于项目的成功和保护两方的利益非常重要 兴趣。本文介绍了在提交时间表时非常困难的选择。 不合格,不应该被批准。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号