Ground deformation monitoring of Shenzhen metro area with Interferometric Point Target Analysis

机译:基于干涉点目标分析的深圳市区地面变形监测。

获取原文

摘要

Interferometric Point Target Analysis (IPTA) is a method to exploit the temporal and spatial characteristics of interferometric signatures collected from point targets to accurately map surface deformation histories, terrain heights, and relative atmospheric path delays. In this study, we applied the IPTA technique to monitor the ground deformation of Shenzhen urban area and along the Shenzhen metro lines. The available SAR dataset consists of 20 images from the satellite mission ENVISAT between January 2008 and July 2010. The maximum subsidence rate reaches up to −17.9 to −10 mma−1. The maximum rise rate reaches up to 6 to 9.8 mma−1. The Point Target velocity map shows that there is a strong subsidence in Shenzhen urban area, and the subsidence rate is larger than −10 mma−1. There is also severe subsidence along the metro lines, especially at the stations. The subsidence in the first phase of the Shenzhen metro project is less than the second phase of metro project. The subsidence along the elevated line is less than the underground line. The locations of ground collapse events are mainly distributed at the metro stations.
机译:干涉点目标分析(IPTA)是一种利用从点目标收集的干涉特征的时空特征来准确绘制表面变形历史,地形高度和相对大气路径延迟的方法。在这项研究中,我们应用IPTA技术监测深圳市区和深圳地铁沿线的地面变形。可用的SAR数据集由2008年1月至2010年7月之间的卫星飞行任务ENVISAT拍摄的20张图像组成。最大沉降率高达-17.9至-10 mma -1 。最大上升率高达6至9.8 mma -1 。点目标速度图显示,深圳市区存在强烈的沉降,沉降速率大于-10 mma -1 。地铁沿线也存在严重的沉降,尤其是在车站。深圳地铁一期工程的沉降量小于地铁二期工程的沉降量。沿高架线的沉降小于地下线。地面倒塌事件的位置主要分布在地铁站。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号