首页> 外文会议>ASME biennial conference on engineering systems design and analysis >USING OF THE CONCEPTS OF ROLES AND CONTEXT IN A PROJECT MANAGEMENT/PLM SOLUTION: THE REAL CASE STUDY OF LASCOM
【24h】

USING OF THE CONCEPTS OF ROLES AND CONTEXT IN A PROJECT MANAGEMENT/PLM SOLUTION: THE REAL CASE STUDY OF LASCOM

机译:角色和上下文概念在项目管理/ PLM解决方案中的使用:LASCOM的真实案例研究

获取原文

摘要

The software tools for PLM and project management are often built around several classical concepts: Processes, Activities, Phases, Artefacts, Workflows, Resources and Relationships. This approach does not really consider the team concept and the particular dynamics of the project management. This leads to a paradox with PLM and project management software tools. They tend to reduce risk and improve performance by structuring, streamlining, automating and scheduling projects without considering projects are not well-structured and have their own dynamic. The negation of project management mode increases the risks of project failures, adds stress to team members and requires the addition of complex mechanisms of collaboration and delegation. PLM Software sometimes becomes a limitation for project management. Our partner, LASCOM, a French PLM software developer, decided to make evolve its solutions to provide customers more efficient PLM solutions. LASCOM initiated a reflection around new concepts for enrich its existing models and tools since few years. The company particularly has an interest on the practical use of the concepts of roles and contexts. This paper deals with the addition of these concepts in the models used by LASCOM. This addition is intended to partially solve the problems posed by the generalization of work by project in organizations.
机译:用于PLM和项目管理的软件工具通常围绕几个经典概念构建:流程,活动,阶段,人工制品,工作流,资源和关系。这种方法并没有真正考虑团队概念和项目管理的特定动态。这导致了PLM和项目管理软件工具的悖论。他们倾向于通过结构化,精简,自动化和调度项目来降低风险并提高性能,而无需考虑项目的结构不合理且具有自身的动态性。否定项目管理模式会增加项目失败的风险,给团队成员带来压力,并需要增加复杂的协作和委派机制。 PLM软件有时会成为项目管理的限制。我们的合作伙伴LASCOM(法国PLM软件开发商)决定发展其解决方案,以向客户提供更有效的PLM解决方案。几年来,LASCOM开始围绕新概念进行反思,以丰富其现有模型和工具。该公司对角色和上下文概念的实际使用特别感兴趣。本文讨论了LASCOM使用的模型中这些概念的添加。此添加旨在部分解决组织中按项目进行的工作概括所带来的问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号