Introducing BIM in i-PgMIS (intelligent Program Management Information System) for estimating budget in the earlier phase of urban renewal mega projects

机译:在i-PgMIS(智能程序管理信息系统)中引入BIM,以估算大型城市更新项目早期阶段的预算

获取原文

摘要

Recently, urban renewal projects are actively being pursued to reactive the depressed cities, restore the function of towns and develop the local economyin Korea. Most of urban renewal projects are mega projects and should be managed at the level of program which is integrated a lot of projects for coordination. For the reason, Korea government has developed i-PgMIS (intelligent Program Management Information System) focused on benefits, stakeholders, and governance for supporting decision-making and management of urban renewal mega projects over life-cycle about cost and schedule. Especially, since this system has to support the decision-making regarding the investment cost to various stakeholders through objective information, budget estimate in the earlier phase is critical. Until now, the methods such as CBR(Case Base Reasoning), MRA(Multiple Regression Analysis), and NN(Neural Network), have been introduced for estimating budget. However, there are three problems. Firstly, they strongly depend on the quality and the quantity of data accumulated from previous similar projects. Secondly, until now, it is not easy to deduct the budget estimate in the earlier phase of the project. Finally, in case of the stakeholder who is not an expert in construction, it is difficult to understand those methods. Thus, this paper presents an alternative method to estimate the budget based on BIM(Building Information Modeling) concept in i-PgMIS because BIM is not case-based budget estimation tool but consisted of a set of attribute to estimate budget. By applying the concept of BIM in the earlier phase, detail properties of buildings (e.g., purpose, area, height and materials) maintained in virtual model are specified. Then, the budget of urban renewal project is calculated based on the defined building models and the unit price database.
机译:最近,正在积极地进行城市更新项目,以振兴沮丧的城市,恢复城镇的功能,并发展韩国的当地经济。大多数城市更新项目是大型项目,应在计划级别进行管理,该计划应与许多项目整合在一起进行协调。因此,韩国政府开发了以收益,利益相关者和治理为重点的i-PgMIS(智能计划管理信息系统),以支持有关成本和进度的整个生命周期中城市更新大型项目的决策和管理。特别是,由于该系统必须通过客观信息来支持各种利益相关者的投资成本决策,因此早期阶段的预算估算至关重要。到目前为止,已经引入了CBR(案例基础推理),MRA(多元回归分析)和NN(神经网络)等方法来估算预算。但是,存在三个问题。首先,它们在很大程度上取决于从以前的类似项目中积累的数据的质量和数量。第二,直到现在,要在项目的早期阶段扣除预算估计值并不容易。最后,如果利益相关者不是建筑专家,那么很难理解这些方法。因此,由于BIM不是基于案例的预算估算工具,而是由一组属性来估算预算,因此,本文提出了一种在i-PgMIS中基于BIM(建筑信息模型)概念估算预算的替代方法。通过在早期阶段应用BIM的概念,可以指定虚拟模型中维护的建筑物的详细属性(例如,目的,面积,高度和材料)。然后,根据定义的建筑模型和单价数据库计算城市更新项目的预算。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号