【24h】

Construction Plan for Flood Detention Areas in Lower Yellow River

机译:黄河下游滞洪区建设规划。

获取原文

摘要

Dongping Lake flood detention area and Beijindi flood detention area are the two most important flood detention areas in lower Yellow River.Due to long-term insufficient investment,the engineering,non-engineering and safety construction in these areas are far lagging behind,which causes serious problems.In order to improve the operation safety of the flood detention areas as well as the safety of people's lives and property in these areas,construction plan is put forward based on the analysis of construction situation and existing problems.The construction plan includes the construction contents and scale of engineering measures,and that of non-structural measures.In addition,three resettlement schemes,namely resettlement of moving outside,nearby resettlement and temporary evacuation,are introduced to reduce the flood risk of residents in the flood detention areas.The corresponding population scale of each settlement scheme is analyzed,along with the construction contents and scale of the supporting safety facilities.
机译:黄河下游两个最重要的洪水滞洪区是东平湖防洪滞洪区和北金帝防洪滞洪区。由于长期投资不足,这些地区的工程,非工程和安全建设远远滞后,导致为了提高防洪滞洪区的运行安全以及这些地区人民生命财产安全,在分析施工现状和存在问题的基础上提出了施工方案。此外,还引入了三种移民安置方案,即搬迁安置,附近安置和临时撤离,以减少滞洪区居民的洪水风险。分析了每个安置方案的相应人口规模,以及其建设内容和规模。配套的安全设施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号