【24h】

Port Zayed Concrete Rehabilitation

机译:扎耶德港混凝土修复

获取原文

摘要

Mina Port Zayed is located in the Island of Abu Dhabi, the capital city of United Arab Emirates which meets the shorelines of the Arabian Gulf. The Rehabilitation Project initiated for the replacement of the Concrete Fenders for Berths 14 to 21 (Berth 19 was by in-situ repair method) of the Mina Zayed Port. This was a major concrete repair and Rehabilitation Project performed for the Public Works Department of Abu Dhabi. The original scope of the Project consisted in removal and replacement of the existing pre-cast panels for the Berth's frontage, install new pre-cast panels, install cylindrical type fenders, install stainless steel ladders to replace the existing galvanized ladders, replace cope edge timbers with new and paint bollards.
机译:米纳港扎耶德(Mina Port Zayed)位于阿联酋首都阿布扎比岛(Abu Dhabi),与阿拉伯海湾的海岸线交汇。修复项目启动,以更换米纳扎耶德港14至21号泊位的混凝土护舷(19号泊位采用现场修复方法)。这是为阿布扎比公共工程部门执行的一项重要的混凝土维修和修复项目。该项目的原始范围包括拆除和更换泊位正面的现有预制板,安装新的预制板,安装圆柱型挡泥板,安装不锈钢梯子以替换现有的镀锌梯子,替换上等木材与新的和油漆的系船柱。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号