DECOMMISSIONING COSTING APPROACH BASED ON THE STANDARDISED LIST OF COSTING ITEMS; LESSONS LEARNT BY THE OMEGA COMPUTER CODE

机译:根据规范的成本计量项目的退役成本核算方法; Omega计算机代码学习的经验教训

获取原文

摘要

The document "A Proposed Standardised List of Items for Costing Purposes" [1] was issues in 1999 by OECD/NEA, IAEA and European Commission (EC) for promoting the harmonisation in decommissioning costing. It is a systematic list of decommissioning activities classified in chapters 01 to 11 with three numbered levels. Four cost groups are defined for cost at each level. Document constitutes the standardised matrix of decommissioning activities and cost groups with definition of content of items. Knowing what is behind the items makes the comparison of cost for decommissioning projects transparent. Two approaches are identified for use of the standardised cost structure. First approach converts the cost data from existing specific cost structures into the standardised cost structure for the purpose of cost presentation. Second approach uses the standardised cost structure as the base for the cost calculation structure; the calculated cost data are formatted in the standardised cost format directly; several additional advantages may be identified in this approach. The paper presents the costing methodology based on the standardised cost structure and lessons learnt from last ten years of the implementation of the standardised cost structure as the cost calculation structure in the computer code OMEGA. Code include also on-line management of decommissioning waste, decay of radioactivity, evaluation of exposure, generation and optimisation of the of the Gantt chart of a decommissioning project, which makes the OMEGA code an effective tool for planning and optimisation of decommissioning processes.
机译:该文件“A成本核算目的项目建议名单规范” [1]是由OECD / NEA,国际原子能机构和欧盟委员会(EC)在1999年的问题,促进统一的退役成本计算。这是退役分类章01至11三个编号级别活动的系统列表。四个成本组在每个级别定义的成本。文件构成退役活动和成本基团与项的内容定义的标准化矩阵。知道什么是落后的项目,使成本退役项目透明的比较。两种方法确定使用的标准化的成本结构。第一种方法从现有的特定成本结构的成本数据转换成标准化的成本结构成本呈现的目的。第二种方法使用标准化的成本结构作为基础的成本计算结构;所计算的费用数据被格式化在直接标准化成本格式;几个额外的优势,可以在这种方法来识别。本文提出了一种基于标准化的成本结构,从过去十年的标准化的成本结构中的计算机代码OMEGA成本计算结构的实施经验教训的成本计算方法。守则还包括在线管理的退役废物,放射性衰变,曝光,产生的评估和的退役计划,这使得欧米茄代码规划和退役流程优化的有效工具的甘特图的优化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号