首页> 外文会议>International conference on environmental remediation and radioactive waste management >KOLA PENINSULA RADWASTE MANAGEMENT IN THE FRAMEWORK OF THE ITALIAN-RUSSIAN COOPERATION AGREEMENT FOR GLOBAL PARTNERSHIP
【24h】

KOLA PENINSULA RADWASTE MANAGEMENT IN THE FRAMEWORK OF THE ITALIAN-RUSSIAN COOPERATION AGREEMENT FOR GLOBAL PARTNERSHIP

机译:意大利与俄罗斯全球合作伙伴关系框架内的可乐半岛废物管理

获取原文

摘要

In 2003 a Cooperation Agreement, envisaging a grant of 360 Meuro in 10 years, was signed between Italy and Russia in the framework of the "so-called" Global Partnership Program. So far, in five years of concrete work, a total of 146 Meuro have been engaged through 33 contracts and 121 Meuro have been already paid. Together with other significant lines of activities the management of waste, presently located at Andreeva Bay site, is surely the most important one, not only for the amount of allocated funds (about the half of available ones) but also for the urgency to solve serious environmental problems linked to the actual unsafe conditions of these waste, both as regards possible incidents or malicious attacks from outside. Volume of Low Level and Intermediate Level (LL/IL) waste at Andreeva Bay site are 17000 tons and 3000 tons, respectively for solid and liquid; moreover is expected, during the next 15 years, the production of additional 33000 tons of liquid and 8000 tons of solid, due to the need of demolishing existing facilities and final closing of the site. As regards radwaste management facilities, the solution defined in OBIN (justification of investment) has been analyzed and critically reviewed. After the completion of a conceptual study, the construction of three facilities (solid and liquid treatment ones and a protective structure for storing on site temporarily conditioned waste) was decided and a contract was assigned in 2010 to Ansaldo Nucleare/AtomStroyExport for the detailed design of the above mentioned facilities, which is expected to be completed in 2012. Some important modifications to the initial time schedule have been taken into account and now the operation of the facilities is expected by 2015, two years before the previous estimate.
机译:2003年,意大利与俄罗斯在“所谓的”全球合作伙伴计划的框架内签署了一项合作协议,设想在10年内提供360 Meuro的赠款。到目前为止,在五年的具体工作中,通过33份合同,总共雇用了146名Meuro,并且已经支付了121名Meuro。与其他重要的活动类别一起,目前位于安德烈耶娃湾场址的废物管理无疑是最重要的,不仅对于已分配资金的数量(大约是可用资金的一半),而且对于解决严重问题的紧迫性也很重要。与这些废物的实际不安全状况相关的环境问题,无论是可能发生的事件还是来自外部的恶意攻击。安德烈耶夫湾厂区的固体废物和液体废物分别为17000吨和3000吨,其中低/中级废物量分别为17000吨和3000吨。此外,由于需要拆除现有设施并最终关闭该场地,预计在未来15年内将再生产33000吨液体和8000吨固体。关于垃圾废物管理设施,已对OBIN(投资合理性)中定义的解决方案进行了分析和严格审查。在完成概念研究后,决定建设三座设施(固体和液体处理设施以及用于在现场存放临时处理的废物的保护性结构),并于2010年与Ansaldo Nucleare / AtomStroyExport签订了合同,以进行详细设计。上述设施预计将在2012年完成。已经考虑了对初始时间表的一些重要修改,现在预计该设施将于2015年投入使用,比之前的估计要早两年。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号