REACTOR CAPITAL COSTS BREAKDOWN AND STATISTICAL ANALYSIS OF HISTORICAL U.S. CONSTRUCTION COSTS

机译:反应堆资本成本故障与历史统计学分析施工成本

获取原文

摘要

In this paper we present the work recently performed with the goal of continuously enhancing the capability to perform nuclear fuel cycle cost estimates and evaluation of financial risk, by developing a defensible basis for the input cost data, starting with an in-depth analysis of historical reactor construction costs in the U.S. For the purpose of evaluating the Levelized Cost of Electricity at Equilibrium (LCAE) of nuclear fuel cycles, reactor capital costs are of particular importance, since they typically comprise more than 50% of the calculated LCAE. The work is divided in two parts: in part Ⅰ we present work aimed at analyzing LWR construction cost break-down from different sources, including U.S. historical data and detailed pre-construction estimates. Detailed information on the quantities and costs of commodities, equipment and labor were collected and summarized for both the un-avoidable construction costs, and for the median historical cases, which include avoidable costs. An in-depth and quantitative analysis was also performed of historical cost increases and of their primary causes. Part Ⅱ presents work aimed at assessing the most appropriate probability distributions for quantifying the uncertainties around the overnight costs, both for avoidable and for non-avoidable uncertainties. Three statistical approaches are used to measure data variations: (1) Decomposition analysis: (2) Simulation modeling; and (3) Econometric modeling.
机译:在本文中,我们通过为投入成本数据的可辩护基础开发历史的深入分析,以持续增强执行核燃料循环成本估算和对财务风险评估的目标,以最近进行的工作展示了最近进行的。美国反应堆结构成本为评估核燃料循环平衡(LCAE)的电力调用成本,反应堆资本成本特别重要,因为它们通常包含超过50%的计算的LCAE。该工作分为两部分:在第一部分中,我们目前的工作旨在分析来自不同来源的LWR施工成本分解,包括美国历史数据和详细的预设估计。收集有关商品,设备和劳动力量,设备和劳动力的数量和成本的详细信息,并概述了不可避免的建筑成本以及中位历史案例,包括可避免的成本。深入和定量分析也符合历史成本增加,其主要原因是。第Ⅱ部分展示了旨在评估最合适的概率分布,用于量化过夜成本周围的不确定性,无论是可避免的还是不可避免的不确定性。三种统计方法用于测量数据变化:(1)分解分析:(2)仿真建模; (3)计量计量造型。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号