首页> 外文会议>International conference on ocean, offshore and arctic engineering;OMAE2011 >NUMERICAL ANALYSIS OF A NOVEL METHOD FOR SUBSEA EQUIPMENT INSTALLATION
【24h】

NUMERICAL ANALYSIS OF A NOVEL METHOD FOR SUBSEA EQUIPMENT INSTALLATION

机译:新型地面设备安装方法的数值分析

获取原文

摘要

This paper and the companion paper OMAE2010-49946 (de Mello et al., 2011) present the experimental and numerical results of the analyses of a novel method for subsea equipment installation. The conventional procedure, which is usually used, may lead to dynamic amplifications, depending on the launching cable stiffness and length. In the proposed method the equipment is lowered using two tug boats in a Y configuration. Trough the control of their relative position and also of the cable length it is possible to diminish the tension amplification.
机译:本文和随附的论文OMAE2010-49946(de Mello等人,2011)介绍了一种新型海底设备安装方法的分析实验和数值结果。取决于所用电缆的刚度和长度,通常使用的常规步骤可能会导致动态放大。在提出的方法中,使用Y型配置的两个拖船降低设备的高度。通过控制它们的相对位置以及电缆长度,可以减小张力放大。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号