首页> 外文会议>International conference on transportation engineering;ICTE 2011 >OPTIMIZING UTILIZATION OF ELECTRIC MULTIPLE-UNIT ON PASSENGER DEDICATED LINES
【24h】

OPTIMIZING UTILIZATION OF ELECTRIC MULTIPLE-UNIT ON PASSENGER DEDICATED LINES

机译:客运专线上多单元电气的优化利用

获取原文

摘要

Combined with existing optimization research on electric multiple-unit (EMU) utilization in China, the core issue of EMU operation is analyzed. Based on the principal of EMU operation planning, a mathematical model for EMU scheduling is established, in the conditions of paired train diagram, using EMU in uncertain railroad region, given maintenance time, place, etc. The connection between EMUs is converted to a Traveling Salesman Problem (TSP) which contains many objectives and many constraints, and is solved with cellular ant colony algorithm. The feasibility of the model and the algorithm is proved by the case of Wu-Guang high-speed railway line.
机译:结合我国现有的电动多机组利用优化研究,分析了电动机组运行的核心问题。基于动车组运行计划的原理,在成对的列车图条件下,在不确定的铁路区域,给定的维护时间,地点等条件下,使用动车组建立了动车组调度的数学模型。 Salesman问题(TSP)包含许多目标和许多约束,可以通过蜂窝蚁群算法来解决。以武广高铁为例,证明了该模型和算法的可行性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号