NIMROD MRA4 PROGRAMME LESSONS LEARNED - A TEST PILOT'S PERSPECTIVE

机译:了解了NIMROD MRA4计划的经验教训-测试飞行员的观点

获取原文

摘要

In December 1996, the UK awarded the contract to BAE Systems to develop the Nimrod MRA4, a replacement Maritime Patrol Aircraft for the Royal Air Force. In October 2010 the programme was cancelled just as the aircraft was due to enter service, 7 years late and approximately £789 million over budget. Cancelled aircraft projects are quickly forgotten; they are an embarrassment to all! However, significant lessons can be learned from them on individual and programme levels: the MRA4 programme pioneered an integrated military-industry Joint Test Team; the author had an "l-leamed-about-test-flying-from-that incident"; procurement of Commercial Off The Shelf equipment is never a cheap strategy but is one that continues to be propagated in the large aircraft arena; modification of legacy aircraft to a modern standard is not the cheapest or simplest option, no matter how it is portrayed at the contract bid stage. The paper seeks to examine these issues, at a level from the individual to the strategic, drawing on the author's personal experiences and observations. Some of the lessons contributed directly to the project's delay, cost and ultimate cancellation. The aim is to avoid that disappointment for future test pilots!
机译:1996年12月,英国将合同授予BAE Systems,以开发Nimrod MRA4,这是皇家空军的替代海上巡逻飞机。 2010年10月,该计划被取消,正好这架飞机将要服役,晚了7年,超出预算约7.89亿英镑。被取消的飞机项目很快就被遗忘了;他们是所有人的尴尬!但是,可以从个人和计划级别上学到很多教训:MRA4计划率先建立了军工联合测试小组;作者发生了“我从那次事故中飞到试验飞行中”;采购商用现货设备从来都不是一种便宜的策略,而是在大型飞机领域继续传播的一种策略。无论是在合同投标阶段,将旧飞机改装为现代标准都不是最便宜或最简单的选择。本文试图从作者的个人经验和观察的角度,从个人到战略层面研究这些问题。一些经验教训直接导致了项目的延迟,成本和最终取消。目的是避免将来的测试飞行员感到失望!

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号