首页> 外文会议>Annual meeting of the Institute of Nuclear Materials Management >A PROLIFERATION ASSESSMENT OF THE MYRRHA ACCELERATOR DRIVEN SYSTEM BASED ON THE PRPP METHODOLOGY
【24h】

A PROLIFERATION ASSESSMENT OF THE MYRRHA ACCELERATOR DRIVEN SYSTEM BASED ON THE PRPP METHODOLOGY

机译:基于PR&PP方法的MYRRHA加速器驱动系统的增殖评估

获取原文
获取外文期刊封面目录资料

摘要

In 2009, the Belgian federal government asked the OECD to nominate a commission to assess on its technical aspects the design of MYRRHA, an Accelerator Driven System based on a PbBi target and cooling with 30-35% MOX fuel. In the framework of this international review, the Belgian Nuclear Research Centre SCK·CEN was asked to provide also an assessment of the proliferation risks of MYRRHA. An assessment was made of the proliferation risks of MYRRHA in comparison with the BR2 MTR, an existing research reactor at SCK·CEN. The assessment was based on the TOPS (Technological Opportunities to Increase the Resistance of Global Civilian Nuclear Power Systems) Barrier Analysis Method and concluded that MYRRHA is more vulnerable for State-supported diversion of nuclear material, while BR2 is more vulnerable for diversion by non-State actors. In this paper we apply the PR&PP methodology, developed by the Proliferation Resistance and Physical Protection Evaluation Methodology Working Group of the GEN IV International Forum. The results of the PR&PP methodology are then compared with the results obtained with the TOPS method. The interest in applying PR&PP lies in that it provides complementary information to TOPS. The TOPS methodology evaluates a larger number parameters, but at a generic system level. The PR&PP considers less parameters, but the system is analyzed in more detail, which provides better insight in the vulnerability of the different diversion pathways. Based on the analysis recommendations will be developed to improve the safeguards approach for an ADS facility. The significance of this work is strengthened by the fact that the results apply not only to MYRRHA, but can be partly extended to other GEN IV reactor concepts that are based on fast reactor technology.
机译:2009年,比利时联邦政府要求OECD提名委员会,以评估其技术方面MYRRHA,加速器驱动系统的设计基于一个PBBI目标,并用30-35%MOX燃料冷却。在这种国际审查的框架内,比利时核研究中心SCK·CEN被要求还提供了MYRRHA的扩散风险的评估。评估是与BR2地铁,在SCK·CEN现有研究堆相比由MYRRHA的扩散风险。该评估是基于TOPS(技术机会,以提高全球民用核能系统的电阻)障碍分析方法得出的结论是MYRRHA对核材料的国家支持转向更加脆弱,而BR2是改道非更容易国家行为者。在本文中,我们运用公关PP方法,由第四代国际论坛的抗扩散和实物保护评估方法工作组制定。的PR&PP方法的结果,然后用与TOPS方法获得的结果进行比较。在它提供补充信息TOPS申请PR&PP谎言的兴趣。顶部的方法计算一个更大的数字参数,但在一个通用的系统级。的PR&PP考虑更少的参数,但是更详细地,它提供了在不同的导流通路的脆弱性更好地了解该系统进行了分析。根据分析建议将发展到提高保障为ADS设备进场。这项工作的意义是,结果不仅适用于MYRRHA,但可以部分扩展到基于快堆技术的其他GEN IV反应器概念的事实加强。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号