首页> 外文会议>Annual meeting of the Institute of Nuclear Materials Management >Japan's Spent Fuel Management Problems: Before and After Fukushima Accident
【24h】

Japan's Spent Fuel Management Problems: Before and After Fukushima Accident

机译:日本的燃料管理问题:福岛事故前后

获取原文

摘要

The operation of Rokkasho reprocessing plant has been postponed till 2012 for repeated serious technical problems. In total, 13,530 tons of spent nuclear fuel is stored in the 20,420 tons total capacity storage pools at the nuclear power plant sites as of September 2010. As 1,000 tons of spent nuclear fuel is generated annually, the storage pool will be filled up within about six years, and though there are several countermeasures being planned, such as re-racking, unless the storage problem is solved, eventually the operation of nuclear power plants would have to be stopped. Furthermore, spent fuel management has become even more complicated by the Fukushima accident. The possibility of introducing an on-site dry cask storage system has become questionable because of the Fukushima accident.
机译:Rokkasho再处理厂的运作已被推迟到2012年,以重复严重的技术问题。总共有13,530吨的核燃料截至2010年9月的核电站站点的20,420吨总容量存储池中。每年生成1000吨的废核燃料,将在其内部填补存储池六年,虽然有若干对策,但重新架构,除非储存问题得到解决,最终必须停止核电厂的运作。此外,花费燃料管理因福岛事故而变得更加复杂。由于福岛事故,引入现场干式储物系统的可能性变得可疑。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号