首页> 外文会议>World congress on computer science and information engineering;CSIE 2011 >The Application of BPR in Seismic Data Processing and Interpretation Management
【24h】

The Application of BPR in Seismic Data Processing and Interpretation Management

机译:BPR在地震数据处理和解释管理中的应用

获取原文

摘要

Seismic data processing and interpretation is the core business of geophysical research, relating to project management, processing, interpretation, and computer departments. The project quality control system of seismic data processing and interpretation needs to establish a unified information management platform, with the rapid development of geophysical study. The idea of BPR(Business Process Reengineering) guides re-carding of seismic data processing and interpretation business chain, designing of deployable two-way information flow control model of management. And process quality control management achieves real-time, visual, traceable, fine and continuous optimization scientific management mode, then improves me quality and efficiency of geophysical project management. It lays a good foundation for better and faster to complete more oil & gas projects.
机译:地震数据处理和解释是地球物理研究的核心业务,涉及项目管理,处理,解释和计算机部门。随着地球物理研究的飞速发展,地震数据处理和解释的项目质量控制体系需要建立统一的信息管理平台。 BPR(业务流程再造)的思想指导地震数据处理和解释业务链的重新梳理,设计可部署的双向信息流管理模型。过程质量控制管理实现了实时,可视,可追溯,精细和连续的优化科学管理模式,进而提高了物探项目管理的质量和效率。它为更好,更快地完成更多油气项目奠定了良好的基础。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号