Four Times the Effort: Big Blue River Bridge Project

机译:努力的四次:大蓝河桥工程

获取原文

摘要

Projects for the Kansas Department of Transportation, Geotech Section are usually pretty straight forward. The geology section has a great working relationship with our design squads. Design changes are usually minor, such as small alignment corrections, right-of-way needs, or minor adjustments to a bridge span. However, one particular project was not that simple, the Big Blue River Bridge replacement and realignment of US-77 highway. The geologic setting is the Flint Hills Region of Kansas with approximately 200 feet of topographical relief and an extensive gypsum mining operation. This project went through 4 alignment changes. Some of these changes moved the roadway as much as 3/4 of a mile, others only a couple hundred feet. The Geotech Section was given 3 months to complete the investigation. After completion of the field work the alignment changed to eliminate an 80 foot rock cut slope. Other alignment shifts were put into place, always after the field work had been started. The final alignment shift was begun by a local landowner. He had a better plan than our design squad. What started out as a simple project now had consumed 1 year of field time, involved numerous design revisions, had major utility impacts and resulted in alterations to two Kansas highway alignments.
机译:堪萨斯州运输部的项目,土工科段通常非常直接。地质科与我们的设计小队有良好的工作关系。设计变更通常是小的,例如小的对齐校正,右路需求或对桥跨度的微小调整。然而,一个特定的项目并不那么简单,蓝色河桥更换和翻新US-77高速公路。地质环境是堪萨斯州的燧石山区,大约200英尺的地形浮雕和广泛的石膏挖掘操作。该项目经历了4个对齐变化。其中一些变化将道路移动到一英里的3/4中,其他人只有几百英尺。土工学段给予3个月才能完成调查。完成现场工作后,对齐改变为消除80英尺的岩石切割斜率。将其他对齐班次放入到位,始终在现场工作开始之后。最终的对齐方式由当地的土地所有者开始。他的设计比我们的设计队伍更好。现在开始作为一个简单的项目已经消耗了1年的现场时间,涉及众多的设计修订,具有重大的公用事业影响,并导致了两个堪萨斯公路对准的改变。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号