Cables installed in surface troughs are a critical part of many transmission circuits. This paper presents a method for calculating the rating of such circuits using computational fluid dynamics techniques, applied to two common trough designs. One design has solid concrete lids while for the second some lids are replaced by grilles to encourage natural air circulation. For the case of covered troughs with solid concrete lids, the IEC 60287 method was found to be conservative owing to its failure to consider the thermal impact of the ground. Good agreement was observed between the CFD model and an improved analytical formulation by Anders. Modeling of partially ventilated troughs, which at present cannot be rated analytically, shows continuous rating increases of up to 31% over the covered design owing to greater air circulation.
机译:安装在地面槽中的电缆是许多传输电路的关键部分。本文提出了一种使用计算流体动力学技术来计算此类电路的额定值的方法,该方法适用于两种常见的槽设计。一种设计具有坚固的混凝土盖子,而第二种设计则用格栅代替一些盖子,以促进自然空气流通。对于带有实心混凝土盖的覆盖槽,由于未考虑到地面的热影响,IEC 60287方法被认为是保守的。在CFD模型和Anders改进的分析公式之间观察到了很好的一致性。目前尚无法通过分析对部分通风的水槽进行建模,由于空气流通量的增加,与覆盖的设计相比,连续通风的水槽的设计连续不断地增加了多达31%的额定值。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号