摘要

In the South of Sichuan province a 240 MW Yeleh hydroelectric plant was constructedby Sichuan Nanya River Basin Hydraulic Power Development Company Limited, a stateownedenterprise, and China Gezhou Ba Water & Power Group Company Limited. Thisproject sets out to develop the mountain cascade of the Nanya River, a tributary of theDadu River, provide superior electricity and adjust flood peak & frequency. Thespecialist contractor Foundation Engineering Company of China Water Resource andHydropower (FEC) was awarded the contract for foundation treatment at the right bank,which included the construction of a 75m deep concrete Cut-Off Wall (COW) inside a6.0m x 6.5m tunnel. The requirement for 19,317m~2 COW to be constructed in permeableand very dense gravel/cobble formations and a demanding project program led FEC toadopt Bauer Low Headroom Cutter CBC25/MBC30 in conjunction with Overlap CutterJoint (OCJ).
机译:在四川省南部建造了一座240兆瓦的耶烈水电站 国有企业四川南亚河流域水力发电有限公司 企业,中国葛洲坝水电集团有限公司。这 该项目着手开发南雅河的支流,即南亚河的支流。 大渡河,提供优越的电力,并调整洪水的峰值和频率。这 中国水利水电建设工程有限公司专业承包商 水电(FEC)获得了在右岸进行地基处理的合同, 其中包括在建筑物内部建造75m深的混凝土防渗墙(COW) 6.0m x 6.5m隧道19,317m〜2 COW透水施工要求 和非常密集的砾石/鹅卵石地层,以及苛刻的项目计划,导致FEC采取了以下行动: 采用宝华(Bauer)低净空刀具CBC25 / MBC30和重叠刀具 联合(OCJ)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号