首页> 外文会议>European Photovoltaic Solar Energy Conference and Exhibition >STUDY ON OPTIMAL INSTALLED CAPACITY OF PHOTOVOLTAIC AND BATTERY TO MINIMALIZE TOTAL COST IN FACTORY
【24h】

STUDY ON OPTIMAL INSTALLED CAPACITY OF PHOTOVOLTAIC AND BATTERY TO MINIMALIZE TOTAL COST IN FACTORY

机译:光伏电池最优装机容量的研究,以极少化工厂总成本

获取原文

摘要

In this paper, a method of scheduling scheme for the electric supply of Factory Energy Management System (FEMS) is presented. Additionally, optimal installed capacity of photovoltaic (PV) cells and battery to minimalize total cost is calculated. PV output including uncertainty is forecasted by using Just-In-Time Modeling (JIT Modeling), and scheme for the electric supply is scheduled based on the forecasted data. Furthermore, simulation for scheduling scheme is carried out with proposed method in various capacity of PV cells and battery, and optimal capacity to minimalize total cost including each initial cost is calculated.
机译:本文介绍了一种调度方案,用于厂工厂能源管理系统(FEMS)的供电调度方案。此外,计算光伏(PV)电池和电池的最佳装机容量,以极少化总成本。通过使用立即建模(JIT建模)预测包括不确定性的PV输出,并且根据预测数据调度电源方案。此外,计算用于调度方案的模拟,以各种容量的PV电池和电池的提出方法进行,并计算最优化包括每个初始成本的总成本的最佳能力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号