首页> 外文会议>European Photovoltaic Solar Energy Conference and Exhibition >5BV.2.59 EXPERIENCE, GRID INTEGRATION AND SHADING 25 YEARS OF TECHNOLOGICAL AND ECONOMICAL LEARNING IN PV SYSTEMS WHAT ARE THE FINDINGS ON THE TECHNOLOGICAL AND ECONOMICAL SIDE FOR ONE GENERATION OF PV APPLICATIONS?
【24h】

5BV.2.59 EXPERIENCE, GRID INTEGRATION AND SHADING 25 YEARS OF TECHNOLOGICAL AND ECONOMICAL LEARNING IN PV SYSTEMS WHAT ARE THE FINDINGS ON THE TECHNOLOGICAL AND ECONOMICAL SIDE FOR ONE GENERATION OF PV APPLICATIONS?

机译:5BV.2.59光伏系统技术和经济学学习的经验,电网集成和遮蔽25年的技术和经济学学习技术和经济方面的一代PV应用的研究结果是什么?

获取原文

摘要

Long time experience by TNC Consulting over 25 years on design and operation of PV plants is used to look back on technological, economical and performance development and give an outlook on possible future challenges. The point of view of a system engineer is stressed, tying to take into account not only upfront costs and gains, but also performance over time and operational costs and developments. Longtime data is presented for exemplary PV plants as well as clustered data over a larger amount of more recent PV plants and a shorter period of time. Overall performance and yield is analyzed in absolute numbers, development over time for exemplary PV plants (back to 25 years) and in a cross-section over numerous plants for more recent PV plants, allowing for possible outlooks on future development. Cost structure of PV systems over 25 years shows a strong decrease in BoS as well as module and inverter costs, but also an increase for BoS in present PV plants. In order to reduce overall PV system costs, BoS costs must be understood correctly and reduced for future projects. Specific aspects from technological development are highlighted and their influence on overall performance and LCOE is assessed.
机译:在设计和光伏电站运行25年跨国公司的咨询很长一段时间的经验来回顾一下技术,经济和业绩发展,并就未来可能面临的挑战进行了展望。视系统工程师的角度强调,绑考虑到不仅在时间和运营成本和发展的前期成本和收益,但也表现。长期数据被呈现为示例性PV植物以及群集数据在更近的光伏电站的一个更大的量和更短的时间周期。整体性能和产量的绝对数量,发展进行了分析随时间的示范性光伏电站(回25岁)和在众多植物的横截面比较晚近的光伏电站,从而对未来的发展前景可能。 PV系统在25年显示出很强的降低的成本结构中的BoS以及模块和逆变器的成本,而且还增加了在本光伏电站的BoS。为了降低整个光伏系统成本,监事会成本必须正确理解并减少未来的项目。从技术发展的具体重点论述及其对整体性能和LCOE的影响进行评估。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号