Re-qualification of the main steam line of a NPP with more detailed analysis of seismic loads and responses

机译:重新鉴定NPP的主蒸汽线,具有更详细的地震载荷和反应分析

获取原文

摘要

The paper describes a case in which with more detailed analysis of the seismic loads and with more elaborated, more accurate model the Main Steam Line of a 1000 MWe class nuclear power plant with BWR has been redesigned. Re-design and re-qualification has resulted in a new piping configuration with significantly reduced number of installed snubbers, and in a more simple support system. The analysis of the piping system has been repeated over twenty years after the original work, whereas the main differences consisted of changes in the piping code and the use of the abundant computational resources available today - besides revision of the earthquake analysis of the buildings as well. Final recommendation consisted in two suggested configuration change packages. One with a significant reduction in the number of earthquake restraints (snubbers) with no need to further analyze elements of the support structure before implementation. A second one with an additional possibility to reduce the number of snubbers, but requiring analysis of piping support structures to see if the higher loads are still allowable or else if a reasonable hardware changes would reinforce structural elements to carry the new load.
机译:本文描述了一种随着抗震载荷更详细分析和更精细的,更精确的模型,其中1000 MWE核电厂的主蒸汽线进行了重新设计。重新设计和重新认证导致了一种新的管道配置,其中安装的缓冲器数量显着减少,并且在更简单的支持系统中。在原始工作之后二十年后对管道系统的分析已经重复,而主要差异包括管道码的变化以及今天可用的丰富计算资源 - 除了修改建筑物的地震分析之外。最终建议包含在两个建议的配置变更包中。一个具有显着降低的地震限制(缓冲器)的减少,无需进一步分析实施前的支撑结构的元素。第二个具有减少缓冲器数量的额外可能性,但需要分析管道支撑结构,看看较高的负载是否仍然可以允许,或者如果合理的硬件变化会加强结构元件以携带新负载。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号