【24h】

Stability analysis of supply chain collaboration for project

机译:项目供应链协作的稳定性分析

获取原文
获取外文期刊封面目录资料

摘要

In order to ensure supply chain collaboration stability, ant colony optimization algorithm was used to study construction supply chain operational efficiency, to determine the dynamic operational errors of construction supply chain. Neural network and data mining technology were used to forecast the investment risk of construction project, to determine the forecasting errors of construction project investment risk. Rough sets and neural network technology were used to evaluate the risk of discrete non-deterministic characteristics in construction process, to determine the risk evaluation errors of construction process for project. Fuzzy neural network with chaotic time series was used to forecast the construction demand of project in a certain period of time, to determine the errors of demand forecast in construction supply chain. Bessel function was used to analyze the stability of construction supply chain collaboration under internal load and external load. Above-mentioned errors is overlapped, and input to Bessel function. System control theory is used to analyze stability state of construction supply chain under the impact load, to determine the method of construction supply chain span.
机译:为了保证供应链协作的稳定性,采用蚁群优化算法研究建筑供应链的运行效率,确定建筑供应链的动态运行误差。利用神经网络和数据挖掘技术对建设项目投资风险进行预测,确定建设项目投资风险的预测误差。运用粗糙集和神经网络技术对施工过程中离散不确定性特征进行风险评估,确定工程施工过程中的风险评估误差。采用混沌时间序列的模糊神经网络对某时期的工程建设需求进行预测,确定建筑供应链中需求预测的误差。贝塞尔函数用于分析内部和外部负载下建筑供应链协作的稳定性。上述错误重叠,并且输入到贝塞尔函数。利用系统控制理论分析了建筑供应链在冲击载荷作用下的稳定状态,确定了建筑供应链跨度的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号