首页> 外文会议>International conference on data storage and data engineering >Study on Engineering Cost Forecasting of Electric Power Construction Based on Time Response Function Optimization Grey Model
【24h】

Study on Engineering Cost Forecasting of Electric Power Construction Based on Time Response Function Optimization Grey Model

机译:基于时间响应功能优化灰色模型的电力施工工程成本预测研究

获取原文

摘要

This paper discussed an improved gray forecasting model for electric power construction project engineering cost forecasting. A method of time response function optimization is proposed, namely using constraint condition of minimum Euclidean distance of original sequence and simulation value to determine the constant C, build time response function optimization grey forecasting model, and then make better use of the original message. Apply the improved model to forecast the main engineering cost index of electric power construction. Compare this grey forecasting method with regression forecasting method, the results show that improved model has higher prediction accuracy and the effect of actual application is better than before.
机译:本文探讨了电力建设项目工程成本预测的改进灰色预测模型。提出了一种时间响应函数优化的方法,即使用原始序列和仿真值的最小欧几里德距离的约束条件来确定常数C,构建时间响应函数优化灰度预测模型,然后更好地使用原始消息。应用改进模型预测电力建设的主要工程成本指标。将该灰度预测方法与回归预测方法进行比较,结果表明,改进的模型具有更高的预测准确性,实际应用的效果优于以前。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号