首页> 外文会议>2011 2nd International Conference on Artificial Intelligence, Management Science and Electronic Commerce >The quantity measuring and valuation of the water conservancy and hydropower projects
【24h】

The quantity measuring and valuation of the water conservancy and hydropower projects

机译:水利水电工程量的计量与评估

获取原文

摘要

With the continuous development of the water conservancy and hydropower projects, the quantity measurement and valuation are more important. Traditional method with the continuous development of market cannot be fulfilled, so the BQ valuation model comes. Based on the model of valuation, it puts forward the connection between quantity measurement and valuation and the meaning of existence.
机译:随着水利水电工程的不断发展,工程量的计量和估价越来越重要。市场持续发展的传统方法无法实现,因此BQ估值模型应运而生。在估价模型的基础上,提出了数量计量与估价之间的联系以及存在的意义。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号