首页> 外文会议>Americas conference on information systems;AMCIS 2011 >Breaking the Iron Triangle: The Impact of Information Sufficiency on Project Portfolio Decisions
【24h】

Breaking the Iron Triangle: The Impact of Information Sufficiency on Project Portfolio Decisions

机译:打破铁三角:信息充足对项目组合决策的影响

获取原文

摘要

It project governance is plagued by an inability to stop projects that ultimately fail, resulting in the loss of scarce resources and IT departments unable to generate full value for money invested. This study investigates the impact of the measurement information framework on information sufficiency, a key factor in reaching effective decisions. Specifically, this research addresses the question "Does a Balanced Scorecard (BSC) measurement information framework provide higher information sufficiency and greater decision making efficacy than the traditional Quality-Cost-Schedule approach in a project governance context?" This question is addressed using a randomized counterbalanced experimental design. Results were encouraging with significant support for two of the three hypotheses positing improved outcomes from use of the Balanced Scorecard framework.
机译:项目治理因无法停止最终失败的项目而困扰,这导致了稀缺资源的丢失,IT部门无法产生所投资的全部价值。这项研究调查了度量信息框架对信息充分性的影响,信息充分性是达成有效决策的关键因素。具体而言,这项研究解决了以下问题:“在项目治理环境中,平衡计分卡(BSC)度量信息框架是否比传统的质量成本计划方法提供更高的信息充足性和更大的决策效力?”使用随机平衡实验设计解决了这个问题。对于三个假设中的两个假说,结果令人鼓舞,这些假说假设使用平衡计分卡框架可改善结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号